TK Global OS — Regulatory notesCryptoasset licensing: United Kingdom, Kenya, Brazil

What actually closes on 28 February 2027 (it is not the gateway)

UK Published 2026-09-04

The two dates are not in the statutory instrument

The Financial Services and Markets Act 2000 (Cryptoassets) Regulations 2026, SI 2026/102, do not contain 30 September 2026 or 28 February 2027 anywhere in the text. Both dates come from a direction the FCA made under regulation 52, published on 20 February 2026, setting an application period from 9:00am on 30 September 2026 to 11:59pm on 28 February 2027. The distinction matters, because regulation 52 also says what that direction does not do.

Regulation 52(5), instrument text: "A direction under paragraph (1) does not prevent applications for a relevant cryptoasset permission being made outside the relevant application period." The FCA says the same on its own page on how the gateway will operate. An application filed on 1 March 2027 is valid. Nothing closes.

What actually ends on 28 February 2027

What ends is eligibility for the transitional saving in regulation 53 — the protection that lets a firm which applied in the window carry on its existing business while its application is determined. Miss the window and the firm keeps the right to apply but loses that cover, and the FCA has said it will not expedite a late application. That is a serious commercial consequence, and it is why the deadline deserves the attention it gets. It is simply not the consequence usually described: "the gateway closes" tells a firm that missing February 2027 forecloses the UK, and it does not. The real choice is between a rushed application and an unprotected one.

A refusal inside the window does not immediately drop you

Regulation 53(1)(b)(ii) keeps the saving alive where a refusal is still "open to review" — that is, while a Tribunal reference or appeal clock is running. Only once the decision is no longer open to review does the narrower regulation 56 exemption take over. To push a firm across earlier, the FCA needs a regulation 55(3) direction, which carries a decision notice and Tribunal right of its own.

Published commentary has in places inverted this, describing refusal as the trigger for transitional protection rather than its end. Read regulation 53(1)(b)(ii) directly.

Regulation 56 does not say "no new UK customers"

Those words do not appear in regulation 56. What it says, at 56(3)(b), is that the exemption has effect "solely to the extent — (i) necessary for the performance of a pre-existing contract... and (ii) where carried on for the purposes of performing such a contract". Regulation 56(4) then defines a pre-existing contract as one entered into before "the relevant day", which is the later of full commencement day and the day the regulation 55 condition is met.

The constraint is therefore contract vintage, not customer novelty. A firm that applies late, falls into regulation 56 and is refused in March 2028 may on the face of the text write new contracts with new UK customers up to refusal, each then itself a protected pre-existing contract. Not a loophole to build a business on, and the FCA has other levers — but a materially different shape from the one most summaries describe.

Three provisions travel with it. Regulation 58 imposes disclosure duties on the exempt firm — exempt status, non-authorisation, and material changes to asset protection, dispute resolution and compensation. Regulation 59 lets the FCA cancel or condition the exemption, with Tribunal rights. Regulation 60 rewrites FSMA section 21 so promotions are permitted where necessary to perform a pre-existing contract.

The long-stop is 24 October 2029

Regulation 1(2): "Subject to paragraph (3) these Regulations come into force on 25th October 2027 (the full commencement day)." Regulations 53(3) and 55(9) both run "at the end of the period of 2 years beginning with the full commencement day". "Beginning with" includes 25 October 2027, so the period expires at the end of 24 October 2029.

Travers Smith, K&L Gates and Freshfields have each published 25 October 2029. One day, and for most firms it will not matter — but it is a wind-down date that goes into run-off plans, and it is checkable against the words of regulation 53(3).

What to check in your own file

Every figure above is instrument text from SI 2026/102, except the two gateway dates, which come from the FCA's regulation 52 direction of 20 February 2026. The FCA application fee is still unpublished; do not budget a number for it.

The checklist behind this article

Our UK gateway checklist is a readiness document for SI 2026/102 and the FCA authorisation rules: every item cited to a regulation or RAO article number, every figure marked as instrument text or reporting of it, and the open questions — the application fee, the unmade amending SI — left marked open rather than guessed. USD 149, updated edition free as the position develops.

If your permission analysis is straightforward — you know which articles you touch and you are filing in the window — the checklist is the whole of what you need. If it is not straightforward, because you sit across an exclusion boundary or a group structure, the 48-hour gap check looks at your specific facts.

Get the note when something actually changes

The UK gateway, Kenya's VASP Act and Brazil's BCB regime. Only when a rule, date or figure moves — and primary sources are always marked separately from press reporting.

More on UK