TK Global OS — Regulatory notesCryptoasset licensing: United Kingdom, Kenya, Brazil

What Actually Closes on 28 February 2027 (It Is Not the FCA Gateway)

UK Published 2026-10-04

The sentence that is almost everywhere, and is wrong

Most commentary on the UK cryptoasset regime says the FCA authorisation gateway "closes on 28 February 2027". Two things are wrong with that. The dates are not in the legislation at all, and nothing closes.

The Financial Services and Markets Act 2000 (Cryptoassets) Regulations 2026 (SI 2026/102) contain no application dates. The instrument was made on 4 February 2026 and, by reg. 1(2), comes into force on 25 October 2027 — "the full commencement day". The window comes from a direction the FCA gave under reg. 52(1), published on 20 February 2026, running from 9:00am on 30 September 2026 to 11:59pm on 28 February 2027.

What reg. 52(5) actually provides

Reg. 52(5) is explicit: "A direction under paragraph (1) does not prevent applications for a relevant cryptoasset permission being made outside the relevant application period." A firm that files in June 2027 has filed a valid application. The FCA says the same on its own guidance for how the gateway will operate, while adding that it will not expedite its assessment to compensate for a late submission.

What ends on 28 February 2027 is eligibility for the transitional saving in reg. 53. The FCA's perimeter guidance policy statement PS26/18, published 16 September 2026, puts it precisely: the window "opens on 30 September 2026 and closes on 28 February 2027 for firms wanting to use the transitional arrangements". The qualifier at the end is the whole point. The accurate phrasing is that the window for the saving closes — not that the gateway closes.

Reg. 52(2) also constrains the FCA: any application period must be at least 28 days long, and its last day at least 28 days before full commencement.

Why the saving is worth more than the fallback

Reg. 53 preserves a firm's position while an in-window application is pending. Reg. 56 is the thinner fallback exemption that applies once reg. 53 runs out. The hinge is reg. 53(1)(b)(ii): a refusal that is still "open to review" — the Tribunal or appeal clock still running — keeps the reg. 53 saving. Only once the refusal is no longer open to review does reg. 56 bite, and to move a firm across earlier the FCA needs a direction under reg. 55(3), which carries a decision notice and a Tribunal right.

This is worth stating plainly because at least one major firm's published alert has it the other way round, describing a rejected application as triggering the transitional provision rather than ending it.

Reg. 56 and the contract-vintage question

Reg. 56 does not contain the words "no new UK customers". Reg. 56(3)(b) gives the exemption effect "solely to the extent — (i) necessary for the performance of a pre-existing contract... and (ii) where carried on for the purposes of performing such a contract". Reg. 56(4) defines a pre-existing contract by reference to "the relevant day", which is the later of full commencement day or the day the reg. 55 condition is met. On the face of the instrument, the constraint is the vintage of the contract, not the novelty of the customer.

Firms should not plan on that reading alone. The FCA's guidance page on how the gateway will operate, as recorded on 22 September 2026, states: "Firms in the transitional provision will not be able to enter into new contracts with existing UK customers or enter into new contracts with new UK customers." The statutory text is unchanged, so the reading above is the statutory reading — but the FCA page is the supervisory expectation, and the two sit in tension. Anyone whose plan depends on the difference should put the point to the FCA rather than rely on the instrument.

Around that core, reg. 58 imposes customer disclosure duties while the exemption applies — exempt status, non-authorisation, and material changes to asset protection, dispute resolution and compensation. Reg. 59 lets the FCA cancel or condition the exemption, with Tribunal rights. Reg. 60 rewrites FSMA s.21 so financial promotions are permitted where necessary to perform a pre-existing contract.

The longstop is 24 October 2029, not 25

Regs. 53(3) and 55(9) both run "at the end of the period of 2 years beginning with the full commencement day". "Beginning with" includes 25 October 2027, so the two years end at the close of 24 October 2029. Several large firms publish 25 October 2029. It is one day, but it is a wind-down date that ends up in a board paper.

Numbers to budget against

None of this makes a late application a good idea. It makes the cost of being late a specific, describable thing rather than a cliff edge, which is what a board needs in order to decide.

The checklist behind this article

The UK Gateway Readiness Checklist is the document version of the above: every application and transitional step for SI 2026/102 and the FCA gateway, each item cited to the regulation, article or policy statement behind it, each figure marked as instrument text or as reporting of it, and the open questions — including the reg. 56 tension described here — left marked open rather than resolved for you. USD 149, with the updated edition free as the position develops.

If your permission set is clear and your only question is sequencing, the checklist is enough on its own. If it is not clear — a group with custody and a trading venue, tokenised securities in the mix, or a plan that turns on the contract-vintage point — there is a 48-hour gap check for that.

Get the note when something actually changes

The UK gateway, Kenya's VASP Act and Brazil's BCB regime. Only when a rule, date or figure moves — and primary sources are always marked separately from press reporting.

More on UK